PROJECTS
- Certified Panel Builder
- Electrical Installation
- Automation System
- Preventive Maintenance
BEIT MISK
BEIT MISK-ATCHANEH-METN
HANDYCO
2023
PREVENTIVE MAINTENANCE
MAINTENANCE CONTRACT 2024-2029
BEIRUT CITY CENTER
ENOVA
2024
MAINTENANCE CONTRACT WITH ENOVA FOR 5 YEARS
USEK
KASLIK
USEK
2014
Modernization of Panel Board along with Preventive Maintenance
VILLA SALY
SENEGAL
ORCA
2023
PANEL BOARD & EIB SYSTEM
AUTOMATION PANEL
BEIRUT
QUANTUMTECH
2022
SCADA SYSTEM PANEL
AARSAL PUMPING STATION
AARSAL
ICRC
2022
SUPPLY, ASSEMBLING, INSTALLATION, TESTING & COMMISSIONING OF AARSAL PUMPING STATION WITH VFD 90KW AND SCADA SYSTEM
ATCL
JOUNIEH - ATCL
ATCL
2021
SUPPLY & INSTALLATION OF VFD FOR MARINE CRANE
HENKEL – CAPACITOR BANK
ZOUK MIKAEL
HENKEL
2012
SUPPLY, ASSEMBLING, INSTALLATION TESTING & COMMISSIONING
ATCL – LIFFTING
JOUNIEH - KASLIK
ATCL
2020
VFD FOR BOAT LIFFTING APPLICATION
St THERESE – AIN EL ROUMANEH
Ain Roumaneh - Chiyah
St Therese
2017
Electrical Study and Installation of advance Laundry
CIMENT DE SIBLINE
SIBLINE - SOUTH LEBANON
CIMENT DE SIBLINE
2013
Supply, Installation, Testing and Commissioning of MV substation - Materials Schneider Electric
NAHR IBRAHIM WATER SUBSTATION
NAHR IBRAHIM - AKAYBE
TAJ
2016
ELECTRICAL INSTALLATION
HAWA CHICKEN
CHEKKA
HAWA CHICKEN
2015
INSTALLATION OF 1600A BUSDUCT FROM SCHNEIDER ELECTRIC
NABATIEH SUBSTATION
NABATIEH
Southern Council
2015
SUPPLY AND INSTALLATION OF MV SWITCHGEAR
9 WATER SUBSTATION
KESERWAN
TAJ
2014
Electrical Installation for 9 water substations in Keserwan - mount of Lebanon
INITIATIVE DU BASSIN DU NIL-1-
KINSHASA - CONGO
Ste.RAY GROUP ENERGY SARL
2025
48VDC,110VDC&400VDC BATTERY CHARGES INTERCONNECTION BETWEEN TWO SUBSTATION
INITIATIVE DU BASSIN DU NIL-2-
KINSHASA - CONGO
Ste.RAY GROUP ENERGY SARL
2025
48VDC,110VDC&400VDC BATTERY CHARGES INTERCONNECTION BETWEEN TWO SUBSTATION
INITIATIVE DU BASSIN DU NIL
Kinshasa - Congo
Ste. RAY GROUP ENERGY SARL
2025
Supply and Assembling of Electrical Panel Boards
V.TOWER-2-
ZALKA
GERGIE ENG. & CONT.
2025
Supply And Assembling of Panel Boards
V.TOWER-1-
ZALKA
GERGIE ENG.&CONT.
2024
SUPPLY AND INSTALLATION OF PANEL BOARDS
UN SPANISH
MARJEYOUN-SUD
SLIKA GROUP
2024
SUPPLY AND ASSEMBLING OF PANEL BOARDS
Hopital St.Charles
Metn- Baabda
Haddad Security & Contracting HSC
2024
Supply & Installation of Panel Boards
VILLA AZZI
AIN SAADE
VILLA AZZI
2024
SUPPLY AND ASSEMBLING OF FORM 2B PANEL BOARDS
LAU – PV SYSTEM
JBEIL
BUTEC SAL
2024
MDB PANEL BOARD FOR PV SYSTEM
KITCHEN DEIR EL SALIB
Bqennaya
FACE SAL
2023
Supply And Assembling of Panel Boards
V.TOWER
ZALKA
GERGIE ENG.&CONT.
2024
SUPPLY AND ASSEMBLING OF SYNCHRONIZING PANEL BOARD
LAU/SMDB-PV SYSTEM
JBEIL
BUTEC SAL
2024
PANEL BOARD FOR PV SYSTEM
CAMEROON HOSPITAL
CAMEROON - DOUWALA
TYROS
2023
PANEL BOARD FORM 2B FOR HOSPITAL IN CAMEROON
NEW LABORATORY SITE
ACHRAFIEH - GEITAWI
GEITAWI HOSPITAL
2022
GEITAWI HOSPITAL EXTENSION
Order of Malta medical and social center
BARQA
ORDER OF MALTA
2022
TYPE TESTED ASSEMBLY
BENTA
DBAYEH
BENTA
2022
CAPACITOR BANK FOR PV SYSTEM- Increase the power factor to allow the PV to open the max
CAPACITOR BANK PANEL
DBAYE
BENTA
2022
CAPACITOR BANK PANEL FOR SOLAR SYSTEM
MDB-ATS KROUM
ZAHLE
ABOU DIB
2022
SOLAR PANEL
BARQA
BEQAA - BARQA
ABOU DIB
2022
Distribution Panels
MANDALOUN-NORMANDI
BEIRUT
MY PROJECT
2022
VFD's PANEL - 5.5KW + 11 KW
MANDALOUN-NORMANDI
BEIRUT
MY PROJECT
2022
Distribution Panels - Form 2b
GEITAWI HOSPITAL – LAB SITE
ACHRAFIEH - GEITAWI
GEITAWI HOSPITAL
2021
AS PER SCHNEIDER RECOMMENDATION
POINTE NOIRE
GABON
BEAVER GROUP
2022
SUPPLY, ASSEMBLING, TESTING & COMISSIONING OF FORM 2b PANELS BOARD
ICRC – ROUMIEH PRISON
ROUMIEH PRISON
ICRC
2022
SYNCHRONIZING PANEL + MDB1, MDB2, MDB3, FORM 2B
LIBAN CABLE
JBEIL
LIBAN CABLE
2020
SUPPLY, ASSEMBLING, TESTING AND COMMISSIONING - FORM 2B
Diwaniah & Kirkuk
IRAQ
QTS
2021
BAABDA
BAABDA
CONSTRATEC
2020
SUPPLY AND ASSEMBLING OF PANEL BOARD
LAKM-AR
AIN EL ROUMANEH - CHIAH
ABOU DIB
2021
FORM 2B PANELS
BUTEC INTERNATIONAL
ALGERIA
BUTEC
2020
TTA PANEL ASSEMBLING
BEL HORIZON
ADMA
BEL HORIZON
2014
COMMUTATION A LA CHARGE BETWEEN 2 GENERATORS
VILLA SAMARA
HAZMIEH
SAMIR SAMARA
2020
5 INCOMING SOURCES PANEL
AIN TSILA
ALGERIA
BUTEC
2019
SUPPLY AND ASSEMBLING OF PANEL BIOARDS FROM 2b
CONSTRATEC
BAABDA
BAABDA 4162
2019
type tested assembly
IMPEX
BEIRUT
METRIC
2020
FORM 2b , TTA PANELS
GEITAWI HOSPITAL
ACHRAFIEH - GEITAWI
GEITAWI HOSPITAL
2019
TTA PRISMA PANEL FORM 2b AND 3
ROUGE NIGHT CLUB
DORA
ROUGE NIGHT CLUB
2019
Urbanista Resto
BEIRUT
Urbanista Resto
2018
EL BARCO
BEIRUT
EL BARCO
2017
GEITAWI HOSPITAL
ACHRAFIEH - GEITAWI
ELECTRANET
2016
AS PER SCHNEIDER MANUFACTURER - FORM 2,3,4b PRISMA P ENCLOSURE
LAU JBEIL – CAR PARK 2
JBEIL
LAU JBEIL
2014
PANEL BOARD FORM 2b - SCHNEIDER ELECTRIC
PREMONT – NIGERIA
NIGERIA
PREMONT
2013
CREPERIE JOUNIEH
JOUNIEH
CREPERIE JOUNIEH
2015
MDB + ATS PANELS
ABC – VIP CINEMA
DBAYEH
ABC
2014
ABC- DBAYEH- VIP CINEMA - CONTROLS PANEL
ACHRAFIEH 4748
ACHRAFIEH
SETELEC
2014
PANEL BOARD SCHNEIDER ELECTRIC - FORM 2b and 3B